The Messerschmitt Bf 109, like the North American P-51,1 might have been the plane that never was. Bayerische Flugzeugwerke (Bavarian Aircraft Company/BFW) was initially blocked from being sent contracts due to a long running feud between Willy Messerschmitt and the Secretary of State for Aviation, Erhard Milch.2 In order to save BFW from liquidation,3 Messerschmitt and his joint manager Herr Kokothanki, obtained a contract from a Romanian cartel, to develop the M-37 light transport. Protests were made against Messerschmitt's acceptance of a foreign contract, but Willy Messerschmitt argued that due to a lack of home support, he was forced to seek contracts outside of Germany. Consequently, BFW was awarded a contract for fighter development.4
In 1934 the German Air Ministry (Reichs Luftsfahrt Ministerium / RLM) issued specifications for a new fighter monoplane to replace the Heinkel He 51 and Arado 68 biplanes.5 It was to be equipped with at least two MG-17 7.9 millimeter machine guns, and to have the capability of utilizing the new liquid cooled vee 12 engines under development by Junkers and Daimler-Benz. The request was sent to Focke-Wulf, Arado, Heinkel and BFW. Focke-Wulf submitted the Fw 159V1, Arado the Ar 80V1 and Heinkel the He 112. The Bf 109 was the winner in the trials, exceeding its nearest rival, the Heinkel He 112, by 17 mph.6 Only the He 112 provided any other serious competition besides the Bf 109 in the trials, and ten preproduction prototypes were ordered for the Heinkel He 112 and Bf 109.
Comments :
Post a Comment